Post Road Concrete Sawing

As new concrete is installed on the southern extent of the Post Road project concrete sawing can be expected to occur overnight.  If installation goes well the overnight sawing should only occur for one evening.  It is expected to occur the evening of October 18th with the possibility of the morning of October 19th.  For further questions, please contact Korey Boehm WisDOT project engineer at (715) 459-2943.